Burnside Park, Avonhead, Christchurch City - Water supply well field
Project involves drilling 5 new wells to various depths
Well Depth: Well 6 – 131m
Well 7 – 168m
Well 8 – 133m
Type: Each well has a 450mm pre-liner at varying depths then a 300mm epoxy coated well casing is telescoped through the pre-liner
Drilling Method: Air rotary, Mud rotary and Percussion
Date: July 2012 -13
Council Hill Road, Little River, Banks Peninsula - Water Supply
Project involves drilling one new well
Well Depth: Drilled to 115m (65m into solid rock)
Type: 450mm pre- then a 300mm epoxy coated well casing is telescoped through the pre-liner
Drilling Method: Air rotary
Date: March 2013
Thompsons Road, Belfast, Christchurch - Water supply well field
Project involves drilling one new well
Well Depth: Well 3 – 171m
Type: 450mm pre- then a 300mm epoxy coated well casing is telescoped through the pre-liner
Drilling Method: Mud rotary and Percussion
Date: June 2012
Trafalgar Street, Edgeware, Christchurch - Water supply well field
Project involves drilling one new well
Well Depth: Well 7 – Current
Type: 450mm pre- then a 300mm epoxy coated well casing is telescoped through the pre-liner
Drilling Method: Mud rotary and Percussion
Date: August 2012